The fire department and police required optimal connection to the local transport network for operational purposes and accessibility – the joint accommodation of both facilities at one location was consistently implemented here.
The construction project for the new building in the Jebenhausen district of Göppingen provides space for the local police station and the local volunteer fire department. The shared new building has clearly separated uses and separate entrances, but is designed as a shared cuboid building with a length of about 47 meters.
The fire station itself consists of an administrative area with an adjacent vehicle hall. The two-story administrative area built of solid concrete has concrete ceilings above the ground and upper floors as well as in the stairwell. Operational rooms such as changing rooms and radio room are connected to the vehicle hall on the ground floor with direct access. Training rooms with kitchenette, youth room, instrument storage, and administrative area are located on the upper floor. These are connected to the hall via a gallery.
The single-story vehicle hall with three parking spaces for fire trucks and a separate garage for police vehicles is constructed as a lightweight structure with reinforced concrete columns and a wooden supporting structure above. The vehicle hall is completed by four sectional doors, a concrete floor slab, ceiling radiation for temperature control, and a designated storage area.
The two-story police post is designed in compact solid concrete construction with an open staircase. The room program is oriented towards functional and necessary police procedures. On the ground floor are the operations management with direct contact to the visitor airlock, as well as the interrogation room with an adjacent detention room and a storage area accessible directly via the police garage. Other rooms such as the post management, administrative area, and changing facilities are located on the upper floor.
The flat roof consists of a two-percent pitched and insulated structure with extensive greenery. Additionally, a photovoltaic system was installed on the roof. The roof surface, including overlays for the green roof, runs continuously over the administrative area, vehicle hall, and police station. The building gains a high-quality, distinctive character through its color-coated, thermally insulated, and suspended metal facade with designed profiles.
Text: Gaus Architects
Photos: MRP Studio, Michael Renner
Isometry and parts of the drawings: Konstantin Eschbach in the FASSADE 4.0 seminar at TUK