Helmholtz-Zentrum Berlin (HZB) Testing Hall

2020
Laboratory / Research Building
Albert-Einstein-Straße 15
12489 Berlin
Deutschland
Laboratory / Research Building
Photovoltaics
Metal
Ribbon façade
Flat roof
concentric
rear-ventilated

NEW CONSTRUCTION OF A LABORATORY AND WORKSHOP BUILDING

The Helmholtz-Zentrum Berlin für Materialien und Energie operates two research infrastructures that are also used by around 3,000 trade fair guests from all over the world. One of them is the synchrotron radiation source BESSY II at the Berlin-Adlershof site.

To ensure reliable user operation of BESSY II in the future, the two construction phases of the testing hall with laboratories, offices and meeting rooms as well as workshops and halls were built. On the eastern side of the construction site, the 1st construction phase of the testing hall has been built with measuring stations and test benches for the institutes of Accelerator Physics, SRF Science and Technology HZB and Undulator Building. Special requirements require several special constructions, such as special radiation protection, fire protection and safety measures for building in sensitive environments [BESSY II]. Both construction phases are designed as a reinforced concrete structure with a rear-ventilated and thermally insulated metal façade.

In addition, the 2nd construction phase was equipped with a building-integrated photovoltaic system [BIPV] made of CIGS modules. For example, a "real-world laboratory" has been created for HZB, where research is carried out on topics such as long-term monitoring and yield analyses in real operation.

With DGI services

General Planning, LP 1-9 HOAl | Fire protection planning LP 1-5 and 8 (only 1st construction phase),
Fire protection concept, fire protection consulting, implementation planning;
BIM-supported specialist construction management fire protection 1.BA.
GP with Structural Engineering/ Thermal Building Physics: Krebs+Kiefer
Advice on sound insulation and room acoustics: Moll GmbH
Consulting for the use of heavy-duty concrete: Pontax GmbH

GFA 2,364 m²
NUF 1,200 m²
Gross area 12,263 m²

Client

Helmholtz-Zentrum Berlin für Materialien und Energie GmbH

Text: DGI Bauwerk Gesellschaft von Architekten GmbH
Photos: Andreas Muhs, DGI Bauwerk Gesselllchaft von Architekten GmbH

Photovoltaic façade

Facade area: 378 m²
Number of modules: 360 modules
System output: 48.0 kWp
Colour: SKALA Blue 7003
Project partner: AVANCIS GmbH & SCHRAG Fassaden GmbH

#photovoltaik #solar #solarmodul #solarfassade #skala #powermax #bipv #avancis

Used Products