More Over
Application
Temporary post-treatment with KOROCURE begins immediately and in sections after the concrete has been installed. If the evaporation is greater than the expected bleeding, the intermediate follow-up treatment is carried out as early as possible. The same applies to concrete paving with a W/Z value < 0.5, where the surface must also be protected by an intermediate post-treatment. If it is primarily used as a primer for subsequent hard coatings, KOROCURE must be applied immediately after the concrete is ready to be walked on. No water should stand on the concrete, the surface should be matt damp.
Properties
Processing
KOROCURE does not replace the necessary post-treatment of the smoothed KORODUR industrial floor.
Delivery form
30 kg plastic container
Storage
Store in a cool, dry and frost-free container in the original container.
Shelf life approx. 12 months. Close opened containers immediately.
Technical Information
Form: liquid
Colour: yellowish
Density: (20 °C) i. min. 1.0 kg/dm3
pH value: approx. 11
Material consumption (depending on the absorbency of the substrate): approx. 120 g/m2
Yield per 30 kg container: approx. 250 m2