More Over
Execution reliability through project-specific design
Fast, economical work thanks to optimised formwork solutions
MaterialCost security due to precise prefabrication in the Doka prefabrication service
Comprehensive occupational safety thanks to suitable accesses and working platforms
Technical Information
Top 50 in detail
Depending on the expected load, the distances between the Doka H20 formwork girders (1) and the girders made of steel wall beams (2) are planned to be tighter or wider. The formlining (3) can be freely selected – for a wide variety of requirements. (see Fig. 2)
Formwork construction in the prefabricated service
The individual parts of the Top 50 can be quickly assembled into ready-to-use elements with simple fasteners: this saves assembly costs. Prefabrication in the prefabrication service ensures excellent quality of the elements for exact element joints and a first-class joint pattern, even with demanding geometries. If the number of applications is high, the use of the Top 50 large-area formwork is particularly worthwhile.
Formwork lining assignment and anchor grid freely selectable
Importantarchitectural requirements can be met with the Top 50 system.
Application
Exposed concrete
Due to the arbitrary formwork covering and adaptation to any building shape, the Large-area formwork Top 50 is particularly suitable for concrete with increased demands on the surface (fair-faced concrete).