More Over
Application
For the production of highly stressed industrial floors, e.g. multi-storey car parks, industrial halls, assembly halls, aircraft hangars, workshops, high-bay warehouses and other industrial areas with the highest loads. For indoor and outdoor use.
Properties
Processing
layer
When processing as a hard screed in accordance with DIN 18560-7, KORODUR VS 0/5 is mixed in a forced action mixer for approx. 3 minutes, depending on the type of processing, according to the above mixing ratio. For further processing, see the corresponding sections Substrate, Processing, Post-Treatment and Joints according to data sheet NEODUR HE 65.
Aftertreatment
Different temperatures influence the solidification or hardening process. The KORODUR hard coating must be protected from drying out too quickly in accordance with DIN EN 13670 / DIN 1045-3. For post-treatment of the KORODUR hard coating, we recommend the products KOROMINERAL CURE or KOROTEX (see data sheets). If subsequent surface treatment, coating or markings are planned, the post-treatment should only be carried out with film.
Joints
The joint grid must be specified by the planner. The hard screed must be separated from rising components (walls, columns, etc.).
Delivery form
25 kg special paper packaging
Storage
Store in a dry place.
Technical Information
Test values measured on defined test specimens as a ready-mixed hard screed with binder - according to DIN 18560-7 or EN 13813
Quality: CT-C70-F10-A6
Hard material group according to DIN 1100: A
Grinding wear (wear resistance according to Böhme according to DIN EN 13892-3): ≤5.0 cm³/50 cm²
Compressive strength [N/mm²] (after 28 days, measured on defined prisms according to DIN EN 13892-2): C70
Flexural tensile strength [N/mm²] (after 28 days, measured on defined prisms according to DIN EN 13892-2): F10
Temperature (processing, ambient and substrate temperature): ≥5 °C
Hard material consumption layer (mixing ratio (MV) by weight parts (GT): 1 GT Cement (CEM I 42.5 R) : 3 GT KORODUR VS 0/5):